Y
YT
Yves TallaSelf-build homes

3h in Nkolbisson, Yaoundé

Two years of weekend work, paid for in stages as money came in. The roof went up last, once the walls had a season to dry out.

Y
BM
Brenda MballaRenovations

7h in Bonamoussadi, Douala

The original house stayed put. We built the second unit behind it, facing the courtyard instead of the street.

Y
CT
Collectif Terre RougeLocal materials

12h in Bafoussam

No firing, no transport cost. The press does one brick every forty seconds once the mix is right.

Y
AE
Association Eau Pour TousCommunity projects

1d in Garoua

Twelve households, one contribution list, and a driller who gave us a fair rate for the whole street at once.

Y
PE
Paul EkwallaBefore & after

1d in Kribi

We didn't rebuild it, just fixed what was failing: new tiles, a proper drip edge, and screens against the harmattan dust.

Y
AN
Atelier NsimeyongConcepts

2d in Yaoundé

Instead of fighting the slope with retaining walls, the plan steps down with it, three short flights across the whole footprint.

SCALE 1:75
Y
CM
Chantier MbeuhLocal materials

3d in Bamenda

Cut, lashed, and standing within a day. It comes down just as fast once the walls are past the second floor.

Y
RF
Rosine FoudaSelf-build homes

4d in Makepe, Douala

We added one room a year, whenever there was enough saved. The kitchen came last, once the family had outgrown cooking outside.

Y